Introduction
Romans are the pioneer engineers in this
field. They started construction of roads for animal carts with stone
Pavements. Today different materials are
used for getting a hard durable surface to use as roads. In a country the roads
are made for conveying men and materials like flow of blood through the veins
in a human body. Road construction
Road Project
It means planning, designing, and
construction of a new road, connecting two terminus points. In a remote village
we had to construct a road. It begins from a road, to that end there are some
small cottages. They did not allow us to start the work. Then we went to the
other end and started the work, one of the land owner raise a problem. he said
there would be deep cutting in the front of his house. Actually even the
present cutting could be halved. I explained it to him, and he agreed. Road construction. Finally
we came to first end, and had given compensation to the cottage people. Project
is finished.
Road Specifications
The standard according to which engineering
structures are constructed is called specifications. Writing specifications
needed skills. The specifications for the consolidations of stone ballast are
as follows. Before spreading stone metals the old metaled surface shall be
thoroughly cleaned of all dirt. The holes should be roughly filled. The whole
old surface is roughened. The stone metal shall spread evenly over the surface
true to the template. The metal shall be clearly hand- packed, the bigger size
metals shall be placed below smaller ones. No organic materials shall be
spread. Road construction. The metal shall be rolled with road roller. No lines of the roller are
left on the surface. After this blinding material be spread evenly over the
whole surface, only just fill all interstices. The blinding materials shall not
contain clay or organic matter.
Specification for Laying Soling
Soling shall be provided when the sub grade
is not hard. Stone boulders are used as soling. The width of soling shall be 30
cm more than the carriage way. The thickness of soling shall be 15cm if it is
stone boulders.
Before laying the soling coat, the sub-grade should be thoroughly leveled. Sub-grade should be hard and well compacted and no soft patches or depressions are there. The soling shall then be dry rolled with a road roller. If water logging is present proper drainage shall be provided. Water bound macadam road method is suitable for water logged areas. Road construction
Before laying the soling coat, the sub-grade should be thoroughly leveled. Sub-grade should be hard and well compacted and no soft patches or depressions are there. The soling shall then be dry rolled with a road roller. If water logging is present proper drainage shall be provided. Water bound macadam road method is suitable for water logged areas. Road construction